Hibbard Park OSLAD Development
Work generally includes asphalt paving, asphalt color coat, concrete paving, integral curb at walk, curb at playground, poured-in-place surfacing, chainlink fence, ornamental aluminum fence, playground equipment, picnic shelter, shade sail, bench, picnic table, playground underdrainage, drain cleanout, drinking fountain, backflow preventer, shade trees, shrubs, perennials, and lawn restoration.
Bid Set - Drawings
(click to expand/collapse)

Name | Size | ||
2025_04_11 Hibbard Park OSLAD Development 1348 - Sheet Set | 16.0 MB |